La Milano

lynxking Check Cord Dog Leash Long Lead Training rope3/8"x30', Orange

Description: lynxking Check Cord Dog Leash Long Lead Training rope3/8"x30', Orange Product Details Item Weight: 14.1 ounces Manufacturer: Keenleader.,ltd. Country of Origin: China Item model number: LL-1 Item Package Dimensions L x W x H: 11.14 x 6.1 x 2.76 inches Item Dimensions LxWxH: 360 x 0.38 x 0.38 inches Brand Name: Lynxking Target Audience Keyword: dogs Directions: DOG Model Name: check cord Color: Orange Size: rope3/8"x30' Material: Polypropylene, Metal Care Instructions: Hand Washable Style: round rope lead Breed Recommendation: Petites races Included Components: leash Specific Uses for Product: dog Is Discontinued By Manufacturer : No Product Dimensions : 360 x 0.38 x 0.38 inches; 14.11 ounces Item model number : LL-1 Manufacturer : Keenleader.,ltd. Country of Origin : China Brand: Lynxking Product Dimensions: 360"L x 0.38"W SUITABLE THICKNESS CHECK CORD: To find a balance between weight and strength. 3/8” is a suitable thickness for long training dog leash, it has both strength and portability NO TANGLE LONG ROPE LEASH: the round climbing rope and 360 degree rotating clasp design long training leash will not tangle whether it is in use or when you roll it up, great for hiking, camping, training, hunting, backyard, beach, recall training, outdoor play with tennis balls, and swimming LIGHTWEIGHT AND NOT ABSORB WATER: soft and lightweight Non-absorbent material won't get more and more heavy in the water and won’t sink, it will float when submerged and highly visible against any background. SOFT AND DURABLE DOUBLE LAYER WOVEN HANDLE: check cord has a comfortable woven double layer handle, the joint of the rope is sewn by the machine and is very strong. SIZE: 3/8" (9.5 mm) in diam ,Size of this one is 30foot,color orange, by 10 foot 15 foot, 30 foot and 50 foot three length for different training purpose

Price: 33.9 USD

Location: New York, New York

End Time: 2025-01-26T17:01:29.000Z

Shipping Cost: 0 USD

Product Images

lynxking Check Cord Dog Leash Long Lead Training rope3/8"x30lynxking Check Cord Dog Leash Long Lead Training rope3/8"x30lynxking Check Cord Dog Leash Long Lead Training rope3/8"x30lynxking Check Cord Dog Leash Long Lead Training rope3/8"x30lynxking Check Cord Dog Leash Long Lead Training rope3/8"x30lynxking Check Cord Dog Leash Long Lead Training rope3/8"x30

Item Specifics

Return shipping will be paid by: Seller

All returns accepted: Returns Accepted

Item must be returned within: 30 Days

Refund will be given as: Money back or replacement (buyer's choice)

Return policy details:

Type: Does not apply

Material: Polypropylene, Metal

Dog Size: Does not apply

Dog Breed: Does not apply

Gender: Does not apply

Personalize: Does not apply

Model: Does not apply

Country/Region of Manufacture: Does not apply

California Prop 65 Warning: Does not apply

Personalization Instructions: Does not apply

Unit Quantity: Does not apply

Unit Type: Does not apply

Item Weight: 14.1 ounces

Manufacturer: Keenleader.,ltd.

Country of Origin: China

Item model number: LL-1

Item Package Dimensions L x W x H: 11.14 x 6.1 x 2.76 inches

Item Dimensions LxWxH: 360 x 0.38 x 0.38 inches

Brand Name: Lynxking

Target Audience Keyword: dogs

Directions: DOG

Warranty Description: 2 years

Brand: Lynxking

MPN: LL-1

Recommended

lynxking Check Cord Dog Leash Long Lead Training rope3/8"x30', Orange
lynxking Check Cord Dog Leash Long Lead Training rope3/8"x30', Orange

$32.05

View Details
Lynxking Check Cord Dog Leash Long Lead Training Tracking Line Comfortable
Lynxking Check Cord Dog Leash Long Lead Training Tracking Line Comfortable

$26.91

View Details
Check Cord Dog Leash Long Lead Training Tracking Line Comfortable Handle Heav...
Check Cord Dog Leash Long Lead Training Tracking Line Comfortable Handle Heav...

$25.23

View Details
Lynxking Dog Leash Slip Lead Snap Hook Rope Leash Strong Heavy Duty Braided Dog
Lynxking Dog Leash Slip Lead Snap Hook Rope Leash Strong Heavy Duty Braided Dog

$21.65

View Details
Check Cord Dog Leash Long Lead Training Tracking Line Comfortable Handle Heav...
Check Cord Dog Leash Long Lead Training Tracking Line Comfortable Handle Heav...

$22.32

View Details
Dog Collar Soft Padded Breathable Cotton Solid Color Strong Adjustable Pet Co...
Dog Collar Soft Padded Breathable Cotton Solid Color Strong Adjustable Pet Co...

$20.19

View Details
Check Cord Dog Leash Long Lead Training Tracking Line Comfortable Handle Heavy D
Check Cord Dog Leash Long Lead Training Tracking Line Comfortable Handle Heavy D

$45.00

View Details
Check Cord Dog Leash Long Lead Training Tracking Line Comfortable Handle Heav...
Check Cord Dog Leash Long Lead Training Tracking Line Comfortable Handle Heav...

$25.23

View Details
Lynxking VIOLET Classic Dog Leash Heavy Duty Nylon Lead Leash 1" x 4' Sz L - NEW
Lynxking VIOLET Classic Dog Leash Heavy Duty Nylon Lead Leash 1" x 4' Sz L - NEW

$10.99

View Details
lynxking Check Cord Dog Leash Long Lead Training rope3/8"x30', Orange
lynxking Check Cord Dog Leash Long Lead Training rope3/8"x30', Orange

$32.05

View Details